Deck Footing Calculator
This deck footing calculator works out how many footings a deck needs, how big each one must be, and how much concrete they take. Enter the deck size, whether it is attached to the house, the beam rows and post spacing, the design load, the soil bearing capacity, and the footing depth, and the deck footing calculator returns the footing count, diameter, load per footing, and concrete in yards and 80 lb bags.
Preliminary sizing. Follow your local code tables and frost depth.
Results
The Deck Footing Calculator is part of our Structural collection. Browse more structural to size, convert, and check your work alongside this tool.
What the deck footing calculator does
Each deck post carries the weight of the deck area around it, its tributary area, down to a footing. The footing spreads that load over enough soil to keep the bearing pressure within what the ground can take. The deck footing calculator works out the tributary area from the beam layout and post spacing, multiplies by the design load, divides by the soil capacity to get the bearing area, and rounds the diameter up to a standard size.
Deck footing size formula
For an attached deck with one beam, the beam carries half the joist span; with more beams, each interior beam carries one full span:
The count is beam rows × (length ÷ post spacing + 1). Concrete per footing is π ÷ 4 × diameter² × depth, and one 80 lb bag yields about 0.6 cubic feet.
Deck footing calculator example
A 16 by 12 ft deck attached to the house, one beam, posts every 8 ft, 50 psf, 1,500 psf soil, 36 in deep:
The deck needs 3 footings. Each takes 5.3 ft³ of concrete, about 9 bags of 80 lb, or 0.59 cubic yards for all three.
How to use the deck footing size calculator
Enter the deck length along the beam and the width in the joist direction. Choose attached if a ledger carries one side, or freestanding. Enter the number of beam rows and the post spacing along each beam. Keep 50 psf for a typical residential deck (40 live plus 10 dead) and 1,500 psf soil bearing unless you know your soil. Add the footing depth to get the concrete. Press Calculate.
Reading your deck footing size
The diameter is the minimum bearing size; a wider footing pad under a smaller post pier works the same. If the size comes out large, add a beam row or shorten the post spacing to cut the load per footing. The depth must reach below your local frost line, which ranges from a few inches in warm climates to over 4 feet in cold ones. Building departments publish footing tables that take precedence.
When to use a deck pier calculator
- Planning footings for a new deck
- Checking a contractor layout
- Ordering concrete and tubes
- Deciding between more posts or bigger footings
- Sizing footings for a hot tub area
Common deck footing calculator mistakes
- Footings above the frost line. Frost heave lifts the deck.
- Ignoring hot tubs. They add 100 psf or more locally.
- Assuming good soil. Use 1,500 psf unless tested.
- Counting end posts as fully loaded. Interior posts govern the size.
Tips for deck post footing size
- Call before you dig to locate buried lines.
- Pour footings on undisturbed soil.
- Use post bases to keep wood off the concrete.
Deck footing spacing and beam layout
Footing size, post spacing, and beam size trade off against each other. Wider post spacing means fewer footings but more load on each one and a deeper beam. Adding a second beam row halves the joist span and the load on the outer beam. Set the joist span first with the joist span calculator, since it decides how far the beams can sit from the ledger.
Concrete for deck footings and sonotubes
Most decks use cardboard form tubes on a wider footing pad, or a bell-shaped form that spreads the load at the bottom. Concrete volume grows with the square of the diameter, so an 18 in footing takes over twice the concrete of a 12 in one. For the bag count across all footings, the concrete bag calculator converts volume into 40, 60, or 80 lb bags. Once the frame is up, the deck board calculator counts the boards and screws.
Deck post footing size by tributary area (50 psf)
| Tributary area | Load | Soil 1,500 psf | Soil 2,000 psf | Soil 3,000 psf |
|---|---|---|---|---|
| 20 ft² | 1,000 lb | 11.1 in | 9.6 in | 7.8 in |
| 30 ft² | 1,500 lb | 13.5 in | 11.7 in | 9.6 in |
| 40 ft² | 2,000 lb | 15.6 in | 13.5 in | 11.1 in |
| 48 ft² | 2,400 lb | 17.1 in | 14.8 in | 12.1 in |
| 60 ft² | 3,000 lb | 19.1 in | 16.6 in | 13.5 in |
| 72 ft² | 3,600 lb | 21.0 in | 18.2 in | 14.8 in |
Deck Footing Calculator FAQ
How many footings does a deck need?
Beam rows × (deck length ÷ post spacing + 1). A 16 ft deck with one beam and posts every 8 ft needs 3 footings.
How big should deck footings be?
Large enough that the load ÷ footing area stays below the soil bearing. For 2,400 lb on 1,500 psf soil, an 18 in diameter footing.
How deep should deck footings be?
Below the local frost line, and at least 12 in below grade in most codes. Check your building department.
How much concrete for deck footings?
π ÷ 4 × diameter² × depth per footing. An 18 in footing 36 in deep takes 5.3 ft³, about 9 bags of 80 lb.